Skip to content
Architecture & software engineering

Legacy modernisation

Incremental strangler migration with the old and the new running side by side and proven equivalent before the switch.

12–24 weeksTypical duration

The problem this solves

A rewrite has been proposed three times and never survived contact with the deadline.

What you receive

Artefacts you can hold, and that you can accept or refuse — never a list of activities.

  • A seam analysis identifying where the legacy system can be cut safely
  • The first slice migrated, running in parallel with traffic shadowed to it
  • An equivalence lane proving the new path matches the old before any switch
  • The sequenced plan for the remaining slices, each independently shippable